Construction Administration Support

Ongoing drawing support through construction: RFIs, submittals, field sketches, and plan revisions on demand.

Available Services

Six request types. 24–48 hour response.

Construction Administration Support keeps your project moving from permit approval through final inspection. Once a building permit is issued, field conditions, contractor questions, and inspector requests generate a steady stream of documentation needs: RFI responses, submittal drawings, field sketches, and plan revisions. We provide fast, professionally formatted responses so the job site never waits on drawings.

Engage CA Support
  • RFI Responses24–48 hrs

    Formatted drawing responses attached directly to the RFI log.

  • Submittal Review Support24–48 hrs

    Drawing coordination in support of contractor submittals.

  • Field Sketch Drawings24–48 hrs

    Fast-turnaround sketches for field conditions requiring resolution.

  • Plan Revision Packages24–48 hrs

    Formally revised sheets for inspector corrections or scope changes.

  • Change Order Documentation24–48 hrs

    Drawings for change order additions, deletions, and modifications.

  • Inspector Response Drawings24–48 hrs

    Drawings resolving inspection holds or correction notices.

  • 24–48 hrs

    Response Time

  • Yes

    Retainer Available

  • 6

    Request Types

  • Job-Ready Files

    Format

How to Engage

Retainer or per-request.

Monthly Retainer

Best for active construction projects. A defined number of drawing hours per month at priority response rates. Predictable cost, guaranteed availability.

Best for

Active construction / 4–8 hrs/month

Per-Request

Best for occasional CA needs. Submit each request individually with scope and reference drawings. We confirm fee and turnaround before starting.

Best for

Occasional needs / variable scope

How It Works

From request to delivery.

  • Retainer Engagement

    Most CA clients engage on a monthly retainer that covers a defined number of drawing hours per month. Retainer engagements have priority response times and predictable monthly cost.

  • Per-Request Engagement

    For projects with variable CA needs, we work on a per-request basis. Requests are submitted with a scope description; we confirm scope, turnaround, and fee before starting.

  • Request Intake

    Each request is submitted with the RFI or field question, reference drawings, and any field photos. We confirm the request scope and turnaround time at intake.

  • Drawing Delivery

    Responses are delivered as stamped, formatted drawing files ready for the RFI log, submittal package, or inspector review. All files are tracked and logged by request number.

What You Get

Documented, tracked, job-ready.

  • RFI Response Drawings

    Formatted drawing responses to contractor RFIs (plans, details, or sections) ready to attach to the RFI log and distribute to the field.

  • Submittal Drawing Support

    Drawing documentation in support of contractor submittals: shop drawing coordination, equipment rough-in confirmation, and dimension verification.

  • Field Sketch Production

    Fast-turnaround field sketches for conditions discovered during construction that require a drawing resolution before work can continue.

  • Plan Revision Packages

    Formally revised plan sheets addressing scope changes, inspector corrections, or field-verified conditions, ready for building department re-submission if required.

  • Change Order Documentation

    Drawing documentation for change orders (revised scope, added work, or deleted work) formatted for the project record and, if required, for permit revision.

  • Request Log and Tracking

    All CA requests are logged by number, date, scope, and status. A running log is maintained and available for project record review at any time.

Common Questions

Frequently asked.

  • Does CA support replace the engineer of record?

    No. We handle drawing production and documentation. Structural, geotechnical, or life-safety questions that require a licensed engineer of record remain with the EOR. We coordinate with the EOR where needed and document the coordination.

  • What is the typical retainer structure?

    Retainers are scoped by drawing hours per month. A typical active construction project requires 4–8 hours of CA drawing support per month. We size the retainer to your project's expected volume at the start of construction.

  • How do I submit a request?

    By email with the RFI number or field description, reference drawing sheets, and any relevant field photos. We confirm scope and turnaround within 4 business hours.

  • What if my project has a fast-track schedule?

    Fast-track projects are accommodated with priority scheduling. We confirm availability at the start of the engagement and flag any periods where capacity may be limited.

Designed For

Who this service is for.

  • General Contractors

    Who need a reliable drawing resource available through construction to respond to field conditions and RFIs without waiting on the original design team.

  • Project Managers

    Managing complex projects with active submittals and RFI logs who need fast, professional drawing responses.

  • Design-Build Teams

    Who need production drawing support through the construction phase without carrying internal drafting staff.

  • Property Owners

    Owner-builders managing their own construction who need drawing support when field conditions don't match the permit plans.

Need drawing support on your project?

Tell us your project stage, request volume, and timeline. We confirm the engagement structure and start with your first request.