Skip to main content
CADTRI

Permitting

City Comments Response

Plan Check Corrections Addressed, Revised, and Resubmitted

Overview

When a building department issues a correction notice, the response needs to be organized, accurate, and easy for the plan checker to review. We analyze each comment, prepare the required drawing revisions, and produce a formal written response that addresses every item directly. Every correction is clouded on the drawings, cited in the response letter, and organized so the plan checker can verify the resolution without searching for it. The goal is a resubmission that closes the review in a single pass.

Response time

5-7 days

Format

Formal letter

Follow-up

Included

How It Works

The process, step by step.

  1. Comment Log Review

    We analyze each plan check item, identify the required resolution, and cross-reference it against the current drawing set.

  2. Drawing Corrections

    All identified deficiencies are corrected and clouded on the relevant plan sheets, with clear markup indicating the nature of each change.

  3. Response Letter

    A formal written response is prepared documenting how each comment was addressed, with sheet and detail references for every item.

  4. Resubmission Package

    The complete resubmission set is assembled: revised sheets, response letter, and any required supplemental documentation, ready to submit.

Deliverables

What's included.

Every engagement includes the following deliverables. Scope is confirmed at intake based on project requirements.

  • Comment Log Review

    Full analysis of each plan check item and its required resolution, cross-referenced against the current drawing set.

  • Drawing Corrections

    Revised and clouded plan sheets addressing each identified deficiency with clear markup indicating the change.

  • Response Letter

    Formal written response documenting how each comment was addressed, with sheet and detail references for every item.

  • Resubmission Package

    Complete resubmission set incorporating all revised sheets, the response letter, and any required supplemental documentation.

  • Follow-Up Coordination

    Available for subsequent correction rounds if the jurisdiction issues additional comments after resubmission.

Designed For

Who this service is for.

General Contractors

Who received a correction notice and need to get the project moving again on schedule.

Property Owners

Navigating an unexpected plan check rejection and unsure how to respond.

Architects and Designers

Who need a production partner to execute the technical corrections and format the response.

Ready to get started?

Tell us your project scope and we will confirm the timeline, deliverables, and next steps.

Stay Informed

Permit guides, code updates, and project insights.

Occasional emails on permitting trends, ADU regulations, and practical guidance for permit and documentation projects nationwide. No spam.